Safety Chainsaw Pants, Giving You The Protection You Need.
always wear rip stop pants and chainsaw jackets when using a chainsaw. which can protect you by stopping the chain or preventing the chain from cutting yourself.
The Performance Hi – Vis Apron Chaps – 6 Layer feature Hi – Visibility Nylon Fabric that is visible by motorists traveling up to 50 mph.
This meets the Class E reflective requirements and earns a Class 3 reflective rating when worn with the Class 2 reflective vest.
The pants also feature reflective tapes.
And when it comes to cutting protection, these pants include six layers of Anti – chainsaw made of polyethylene / polyester, designed to reduce the risk or severity of injury in the event of contact with the rotating saw chain on a gasoline – powered chainsaw.
Outer Shell | 100% ployester oxford fabric |
Lining Fabric | Anti-chainsaw fabric |
Feature | Anti-chainsaw, fire-proof |
Material | Polyethylene / polyester |
Design | Custom design |
Logo | Custom design |
Color | Custom color |
Size | S-XXL, custom size |
Supply Type | FOB |
Packing | 1pc/polybag |
Shiping | DHL, UPS, Fedex, By air, sea |
Delivery Time | Depending on the order quantity |
Sample | Samples are avaliable before bulk order |
Sample Fee | $50,Refund after bulk order finished |
1.Q: What is your minimum order?
A: Our minimum order is 300-800 pcs for each design. (different moqs for differnet jacket )
2. Do you offer free samples?
A: Yes, for stock products, sample can be send within 3 days. For order customized sample, we need about 7 days to produce it.
3. Can I get some discounts?
A: Yes, depending on your order amount, the more you order, the cheaper it willl be.
4. Can I have my logo on the product?
A: Yes,all products can be customized, it’s more than logos and brand; colors,size, patternsc can be changedrequire.
5. How do I check the quality of products?
A: We have experienced QC team of our own and we also accept the inspection of your QC or the QC from third parties.
6. What about the lead time for mass products?
A: For order of 800 quantities, 60 – 90 days of production time is required.